Pedestrian Tunnel in White Oak, NC

Projects Cary, NC Pedestrian Tunnel under CSXT Railroad The White Oak Creek Greenway project for the Town of Cary consisted of the construction of approximately 0.5 miles of pedestrian improvements consisting of approximately 1,191 lf of concrete greenway. 102 lf of 14-ft diameter pedestrian tunnel under CSXT railroad, 916 lf

Read More

Pedestrian Tunnel CSX Railroad

Projects Falls Township, PA CSX Railroad Pedestrian Tunnel Turn-Key Tunneling, Inc was subcontracted for this Pennsylvania Department of Transportation project featuring a 12′ dia tunnel installation using a hydraulic driven tunnel shield. Special conditions: Constructed under an active Conrail track with unstable soil. Project required ground pretreatment prior to tunneling

Read More

Pedestrian Tunnel Villanova Station

Projects West Chester, PA Villanova Station Pedestrian Tunnel Turn-Key Tunneling, Inc was subcontracted to install 15′ dia Pedestrian Tunnel 72 lin using 180″ gasket, galvanized, bituminous coated tunnel liner plate utilizing a tunnel shield. Special conditions: Performed beneath an active AMTRAK railroad per AMTRAK specifications. Excavation limits contained split face

Read More

Pedestrian Tunnel Malvern Station

Projects Malvern, PA Malvern Station Pedestrian Tunnel The project required keeping the 110-year-old station — a key stop for Southeastern Pennsylvania Transportation Authority (SEPTA) commuters — open for business, tunneling under live tracks, maintaining pedestrian and vehicular traffic, and working in a site penned in by a heavily used roadway.

Read More