OIL & GAS PIPELINES

We drill deeper, further and cost effectively.

Oil and gas exploration has seen tremendous traction throughout the United States in recent years as new technologies have allowed companies to drill deeper and further than once imagined. As companies race to bring these new found reserves to market, installation of new pipeline infrastructure has become paramount to being profitable.

Turn-Key Tunneling can perform on- grade installation for railroad crossings, wetland or protected areas, extreme hard rock formations, etc. to allow for timely installation of your pipeline needs. Turn-Key Tunneling has completed numerous projects throughout Ohio, Pennsylvania, Kentucky, and West Virginia to facilitate pipeline installations. 

KEY Projects

Pedestrian Tunnel CSX Railroad

Projects Falls Township, PA CSX Railroad Pedestrian Tunnel Turn-Key Tunneling, Inc was subcontracted for this Pennsylvania Department of Transportation project featuring a 12′ dia tunnel installation using a hydraulic driven tunnel shield. Special conditions: Constructed under an active Conrail track with unstable soil. Project required ground pretreatment prior to tunneling

Read More »

Northeast Ohio Regional Sewer District

Projects Cleveland, Ohio NEORSD Emerald Parkway Design Build Following Inspection it was determined an 11′ corrugated metal pipe (CMP) culvert collapsed causing extensive flooding of a tributary on the Rocky River. Northeast Ohio Regional Sewer District (NEORSD) entered into a Design-Build contract with Turn-key Tunneling, Inc. to replace 250 lf

Read More »

Culvert Repair in Clermont County

Projects Clermont, OH Culvert Repairs in Clermont, OH Created: Oct 31, 2018 Client: State of Ohio Department of Transportation Contractor: Turn-Key Tunneling, Inc. 1247 Stimmel Road Columbus, OH 43223 Phone (614) 275-4832 Owner: Brian Froehlich, PE Location: Clermont County, OH

Read More »