OIL & GAS PIPELINES

We drill further, deeper and more cost effectively.

Oil and gas exploration has seen tremendous traction throughout the United States in recent years as new technologies have allowed companies to drill deeper and further than once imagined. As companies race to bring these new found reserves to market, installation of new pipeline infrastructure has become paramount to being profitable.

Turn-Key Tunneling can perform on- grade installation for railroad crossings, wetland or protected areas, extreme hard rock formations, etc. to allow for timely installation of your pipeline needs. Turn-Key Tunneling has completed numerous projects throughout Ohio, Pennsylvania, Kentucky, and West Virginia to facilitate pipeline installations. 

KEY Projects

Design-Build Project, Belmont, OH

Projects Belmont County, OH Design Build Project A collapsed drain culvert created flooding in Belmont County, OH. Turn-Key Tunneling, Inc. was contacted to investigate and find a solution. The Turn-Key team assessed the issue as a deteriorated and collapsed culvert that needed excavated and replaced. Turn-Key replaced the culvert, restored

Read More »

Sewer & Culvert Repair in Toledo, OH

Projects Toledo Waterway Initiative TWI Phase II Downtown Storage Basin The Toledo Waterways Initiative (TWI) Program encompasses more than 45 separate projects over the course of 18 years, at a projected cost of $527 million As part of Phase II, Turn-Key Tunneling constructed a 725-ft rib and board tunnel utilizing

Read More »

Pedestrian Tunnel Glenolden Borough PA

Projects Glenolden Borough, PA Glenolden Pedestrian Tunnel In 2012, Turn–Key Tunneling, Inc. was awarded a 15’ Diameter Pedestrian Tunnel in Glenolden Borough, Pennsylvania to pass beneath an active CSX Railroad track. The new pedestrian tunnel connects the two halves of Glenolden Park and serves as a primary route for students

Read More »